Products
Stable Connection · Safeguard
Power Transmission
HomeProductsConnecting FittingPT Adjustment Board
PT Adjustment Board
HomeProductsConnecting FittingPT Adjustment Board

PT Adjustment Board

PT Adjustment Board, Hot-Dip Galvanized Steel Adjusting Plate, Heavy Duty Power Line Fitting for Insulator String Length & Sag Adjustment
PRODUCT DETAIL

Premium PT adjustment board (PT-type adjusting plate) – forged steel with hot-dip galvanized coating for high corrosion resistance. Multi-hole design for precise length/sag adjustment of insulator strings. High mechanical strength, easy installation. Ideal for overhead power lines, substations, and transmission tower projects. Compliant with GB & IEC standards, 12-month warranty.

 Key Features

  • Material: High-grade carbon steel (Q235), integrally forged for maximum strength

  • Coating: Hot-dip galvanized (zinc layer ≥85μm), anti-rust & corrosion-resistant

  • Function: Multi-hole design for precise length/sag adjustmentof insulator strings

  • Strength: Rated failure load 7–50kN, high tensile & impact resistance

  • Durability: Withstands harsh outdoor environments, service life ≥50 years

  • Installation: Bolt-on design, compatible with standard power line hardware

  • Certification: GB/T 2314, IEC 61284 compliant, CE certified

Applications

  • Overhead power line insulator string length adjustment

  • Conductor sag & tension control for optimal alignment

  • Transmission tower & substation hardware assembly

  • Suspension/tension clamp connection with insulator strings

  • Lightning protection & earthing system fitting adjustment

  • 10kV–500kV electrical construction & maintenance projects

 Installation Instructions

  1. Select correct model based on required mechanical load & adjustment range.

  2. Clean plate surface & connecting hardware to remove dirt/oxidation.

  3. Align holes with insulator strings/tower fittings; insert bolts.

  4. Adjust length via multi-hole positions; tighten nuts to 25–40 Nm.

  5. Install cotter pins for ;verify secure connection before energization.

Packaging & Shipping

  • Packaging: 20/50 pcs per carton, wooden pallet for bulk orders

  • MOQ: 50 pcs

  • FOB Port: Ningbo/Shanghai

  • Delivery Time: 7–15 days after payment

  • HS Code: 7326901900

Online Inqury
Or use the inquiry form below. Our sales staff will contact you within 24 hours. Thank you for your interest in our products!
0086 18106720952