Products
Stable Connection · Safeguard
Power Transmission
HomeProducts
Products
HomeProducts
Production Process
A Brief Introduction to the Production Process of Power Fittings, Ensuring Quality at Every Step
Heat Treatment
Heat Treatment
01
Precision Machining
Precision Machining
02
Full-Process Quality Inspection
Full-Process Quality Inspection
03
Assembly & Packaging
Assembly & Packaging
04
Blank Forming & Forging
Blank Forming & Forging
05
Raw Material Selection & Inspection
Raw Material Selection & Inspection
06
FAQ
We’ve gathered the key questions our clients ask—so you can get clarity before you even reach out.
1
How can I get a quote quickly?

Send us product model, quantity, destination port, and application. We will reply with a formal quote within 2 hours.

2
How do you handle quality complaints?

We reply within 24 hours. After confirmation, we will provide free replacement, repair, or technical support according to the situation.

3
Do you provide samples and test reports?

Yes. Free samples are available (shipping cost borne by the buyer). Tensile reports, material certificates, and third-party test reports can be provided upon request.

4
How long is the production lead time?

Standard items: 7–15 days.In stock: 24–48 hours delivery.Customized products: 15–30 days.

5
What materials and surface treatments do you use?

Main materials: carbon steel, malleable iron, aluminum alloy, copper alloy.Surface treatment: hot-dip galvanized (standard), electro-galvanized, dacromet, etc. Hot-dip galvanizing is recommended for outdoor and coastal projects.

0086 18106720952