Products
Stable Connection · Safeguard
Power Transmission
HomeProducts
Products
HomeProducts
Production Process
A Brief Introduction to the Production Process of Power Fittings, Ensuring Quality at Every Step
Raw Material Selection & Inspection
Raw Material Selection & Inspection
01
Precision Machining
Precision Machining
02
Full-Process Quality Inspection
Full-Process Quality Inspection
03
Assembly & Packaging
Assembly & Packaging
04
Blank Forming & Forging
Blank Forming & Forging
05
Surface Treatment
Surface Treatment
06
FAQ
We’ve gathered the key questions our clients ask—so you can get clarity before you even reach out.
1
How to become your distributor or agent?

We welcome regional distributors. We offer competitive prices, area protection, catalog support, and technical training. Please contact our sales team for details.

2
Do you provide samples and test reports?

Yes. Free samples are available (shipping cost borne by the buyer). Tensile reports, material certificates, and third-party test reports can be provided upon request.

3
What power fittings do you mainly supply?

We supply a full range of overhead line power fittings, including suspension clamps, tension clamps, connecting fittings, splicing fittings, armor rods, guy clamps, pole line hardware, and custom non-standard fittings for 10kV–1000kV transmission lines.

4
How long is the production lead time?

Standard items: 7–15 days.In stock: 24–48 hours delivery.Customized products: 15–30 days.

5
What payment terms do you accept?

T/T, L/C at sight, Western Union, PayPal.Normally: 30% deposit, balance before shipment.

0086 18106720952